Short answer: RQ048 is a new code in DLA's Master List of Technical and Quality Requirements, added in Revision 45 on October 21, 2026. When a DIBBS solicitation cites RQ048, you may not substitute a different item after award, you must provide supply chain traceability documentation before award and again before shipment, and DLA can invoke Product Verification Testing (PVT) for any reason. RQ048 pulls in three DLAD procurement notes: C03 (traceability documentation), L04 (offers for part numbered items), and E05 (Product Verification Testing). FedOpp suggests small DLA suppliers check every RFQ for RQ048 before quoting and line up their paperwork first. This is not legal advice.
What does RQ048 say?
The official text in the DLA Master List of Technical and Quality Requirements, Rev 45 (dated October 21, 2026) reads:
"The contractor may not substitute a different item after award. The quoter/awardee shall provide supply chain traceability documentation prior to award and before shipment in accordance with DLA Directive (DLAD) Procurement Note 'C03 Contractor Retention of Supply Chain Traceability Documentation'. In addition, DLAD Procurement Note 'L04 Offers for Part Numbered Items' applies. Finally, Product Verification Testing (PVT), can be invoked for this contract for any reason in accordance with DLAD Procurement Note 'E05 Product Verification Testing'."
The cover page of Rev 45 states that the only change from the previous version is the addition of RQ048.
In plain terms, RQ048 asks for three things:
- No substitution. The item you quote is the item you deliver.
- Traceability twice. Documents before award and again before shipment, not only on request.
- Testing on call. DLA can pull samples for PVT, and you may not ship until results come back.
Which RFQs does RQ048 apply to?
Only solicitations that cite it. DLA RFQs list technical and quality codes by number, so search the RFQ text for "RQ048."
Timing matters too. Code RA001 in the same master list says: "For simplified acquisitions, the revision of the master in effect on the solicitation issue date controls." RQ048 first appears in Rev 45, so look at the issue date on the RFQ along with the code list. Our guide on how to read a DIBBS RFQ shows where those codes sit.
What traceability documentation does DLA expect?
RQ048 points to DLAD Procurement Note C03. According to the DLAD Procurement Notes effective July 17, 2026, C03 documentation must include:
- Basic item description
- Part number
- Drawing or specification
- National stock number (NSN)
- Manufacturing source and its CAGE code
- The name and location of every supply chain intermediary from the manufacturer to you to Government acceptance
- When available, the manufacturer's batch identification, such as date codes, lot codes, or serial numbers
C03 also asks you to obtain, keep, and provide records of the inspections and tests that show the supplies conform, such as test reports, test data, material certifications, and manufacturing process sheets.
Under C03, you must make the documents available within three business days of a contracting officer's request and keep them for ten years after final payment. If the documents are missing or unacceptable, the contracting officer may cancel undelivered orders or reject delivered supplies.
The difference with RQ048: C03 on its own says you have the documents or will get them before delivery. RQ048 says you provide them before award and before shipment. Have the package ready when you quote, not after you win.
What does L04 add for part numbered items?
L04 covers items described only by an approved source's CAGE code, a part number, and a short description. It makes you state what you are offering: an exact product, an alternate product, a superseding part number, a previously approved product, or a correction to the CAGE or part number.
Under L04, an exact product comes from the approved source, a dealer or distributor of that source, or a manufacturer working under the approved source's direction with authorization to sell that part number to the Government. A reverse-engineered part, or a part made for the approved source without that authorization, is an alternate product and must be offered as one.
Combined with the no-substitution line in RQ048, the takeaway is simple: decide exactly what you are offering before you quote, because you cannot swap it after award. If you are unsure whether you qualify as an approved source, read our post on approved source NSNs and DIBBS bids.
How does Product Verification Testing work?
RQ048 points to DLAD Procurement Note E05. In the July 17, 2026 procurement notes, E05 says:
- The Government performs PVT at a Government-designated lab.
- You may not ship any material until you are notified of acceptable PVT results, unless the contracting officer directs otherwise in writing.
- The Government provides results within 20 business days after the samples reach the test facility, unless it specifies otherwise in writing.
- You randomly select samples from the production lot, ship them by traceable means with your receiving report and a signed DD Form 1222, and mark the packages "Product Verification Test Samples - Do Not Post to Stock" with the contract and lot numbers.
- The interior package includes the contract, material certifications or process sheets, and the drawings used to make the units.
- Passing samples that survive testing are returned to count toward your quantity. If samples fail, the Government may reject the entire lot.
E05 on its own applies only when the contracting officer invokes it in writing. RQ048 adds that PVT "can be invoked for this contract for any reason." The DLA Master Solicitation Rev 106 (November 3, 2026) lists E05 with a September 2026 date, so check the current note text cited in your award.
Plan for the time and cost of PVT in your delivery days and price. Our posts on first article testing and DLA pricing and setting delivery days on a DLA RFQ cover similar planning.
What should a small supplier do before quoting an RQ048 RFQ?
- Search the RFQ for RQ048 and note the issue date.
- Confirm exactly which product you will offer under L04 (exact, alternate, superseding, or previously approved).
- Build the C03 traceability package now: manufacturer, CAGE, part number, NSN, every intermediary, and lot or date codes.
- Gather inspection and test records, material certs, and process sheets.
- Add PVT time (at least 20 business days after samples arrive, plus shipping) to your delivery days.
- Make sure you can produce documents within three business days and keep them for ten years.
- If you can't meet any of these, skip the RFQ or ask the buyer before you quote.
FedOpp helps small suppliers research NSNs, approved sources, and award history on DIBBS so they can spot requirements like RQ048 before they commit. See our guide on NSN research before bidding.
FAQ
What is RQ048 on a DLA solicitation?
RQ048 is a DLA technical and quality requirement titled "No Product Substitution, Supply Chain Traceability Documentation, and Product Verification Testing." It was added in Rev 45 of DLA's Master List of Technical and Quality Requirements on October 21, 2026. It bars substitution after award, requires traceability documents before award and before shipment, and allows Product Verification Testing for any reason.
When did RQ048 start?
RQ048 first appears in Rev 45 of the DLA Master List of Technical and Quality Requirements, dated October 21, 2026. For simplified acquisitions, code RA001 says the master list revision in effect on the solicitation issue date controls, so check the RFQ's issue date.
What counts as supply chain traceability documentation for DLA?
Under DLAD Procurement Note C03, it includes the item description, part number, drawing or specification, NSN, manufacturing source and CAGE code, every supply chain intermediary from manufacturer to Government acceptance, and batch identification such as lot or date codes when available, plus inspection and test records.
Can I ship before Product Verification Testing results come back?
Not under DLAD Procurement Note E05 as of July 17, 2026, unless the contracting officer tells you in writing. The Government says it provides results within 20 business days after samples reach the test facility, unless it specifies otherwise. Failed samples can lead to rejection of the whole lot.
How long must I keep traceability records?
DLAD Procurement Note C03 says ten years after final payment, and you must provide them within three business days when the contracting officer asks.
As of November 10, 2026. Sources: DLA Master List of Technical and Quality Requirements Rev 45 (October 21, 2026), DLA Master Solicitation for Automated Simplified Acquisitions Rev 106 (November 3, 2026), and DLAD Procurement Notes effective July 17, 2026, all on the DLA Policy and Directives page.