Resources
DIBBS bid checklist
One page to run through before you submit a quote on a DLA RFQ. For the full walkthrough, see how to bid on DIBBS.
Solicitation: ____________________ NSN: ____________________ Return-by date: ____________
1. Eligibility
- Your SAM.gov registration is active and your CAGE code is current.
- You can sign in to DIBBS with a role that can submit quotes.
- Your representations and certifications in SAM.gov are up to date.
- If the RFQ is a set-aside, your business qualifies for it.
2. Read the full RFQ
- Open the RFQ PDF, not just the summary line on the search results.
- Quantity, unit of issue, and required delivery days.
- FOB point (origin or destination) and the inspection and acceptance point.
- Approved sources: if the item is source-controlled, you can quote only an approved part number unless the RFQ allows an alternate offer.
- Quality and technical clauses cited from the DLA Master List of Technical and Quality Requirements (for example, first article testing).
- Any cybersecurity (CMMC), export-control, hazardous material, or shelf-life requirements.
3. Technical data and packaging
- If drawings or specifications are referenced, download them (DLA technical data is in TDMT; you need an AMPS account, and a Joint Certification Program (JCP) certification for export-controlled data).
- Decode the packaging data (MIL-STD-2073-1 codes or ASTM D3951 commercial packaging) and the marking requirement (MIL-STD-129). Use the packaging code decoder.
- Confirm your supplier or packager can meet the packaging and marking.
4. Price it
- Written supplier quote: price, lead time, part number and revision, country of origin, certificate of conformance and traceability.
- Award history for the NSN: last price, quantity, and date.
- Add packaging, marking, testing or first article costs, and freight if FOB destination.
- Delivery days you can actually meet, including supplier lead time.
- Your margin, and the lowest price you would accept.
5. Submit and record
- Enter the quote on DIBBS before the return-by date and time shown on the RFQ.
- Answer every required question in the quote (for example, part number offered, delivery, and any exceptions).
- Save a copy of the submitted quote and the confirmation.
- Log the solicitation, price, and supplier so you can compare with the award later.
6. If you win
- Read the award for any changes from the RFQ.
- Place the purchase order with your supplier with the same requirements (see the purchase order template).
- Set up invoicing in WAWF (in PIEE) if you have not already.
Assistive research only, not legal advice.
Everything FedOpp watches, in one place
Before you work this checklist, make sure you’re seeing every DLA lane, not just the DIBBS RFQ list. FedOpp is more than a SAM.gov or DIBBS search. It checks every lane below against your Match Profile, so you see the work worth bidding without checking several sites.
- SAM.gov, DIBBS and Subcontracts. Public solicitations, DLA parts RFQs and prime contractor subcontract notices, in one workspace with the same filters and scores.
- DLA Urgent Need and the no-bid list. Parts DLA flagged as shortages, and parts DLA asked for and got no bids on.
- SBIR/STTR award notices. Companies that just won research funding and may need parts made, with suggestions on who to contact.
- Today’s picks and FedOpp Bot. The bot picks matches from your profile each day, and FedOpp Bot answers bid and no-bid questions in the dashboard. The AI Contract Reader gives a plain-English brief of the solicitation.
- Watchlist alerts. Watch a keyword, NSN, CAGE or company and get an email when it hits.
- One flat price. $199/mo after a 7-day free trial, with every feature included. Additional users are $49/mo each.
FedOpp does not submit bids or proposals. You decide, and you submit on SAM.gov or DIBBS yourself.
← All resources · Questions: support@fedopp.com
Find repeat DLA buys and quote them the same day.
Start 7-day free trial